Direct Answer / Key Takeaway: Coordinate the approved device, penetration and surrounding construction as one installation. Do not substitute a nominal sleeve or generic firestop detail for the applicable listed arrangement.
For a damper in a confirmed permitted application, match the device to the actual wall or floor penetration. The surrounding assembly is part of the installation evidence. A nominal duct size and a fire-rating label cannot define every sleeve, fixing and edge detail.
Put the actual assembly on one detail
Identify the approved device and installation orientation, the wall or floor construction, opening and relevant supplied components. Obtain the manufacturer's instructions and listing scope for that arrangement. Keep any supplemental detail with the exact model and revision.
Ask the accountable fire, mechanical and construction parties to resolve the complete interface before work proceeds. A generic penetration detail from another service is not automatically suitable for a damper assembly.
Greenheck's 481324 curtain fire-damper manual contains specific requirements for its covered wall and floor arrangements. Those requirements illustrate the need for matched instructions; they do not provide an installation method for another device.
Resolve a discrepancy before concealment
Compare the actual opening and surrounding construction with the accepted detail. Have the responsible parties assess a difference rather than filling, trimming or fixing it through an improvised site solution.
Keep a proposed sealant or firestopping treatment within the exact supported assembly. Adding a material because it is marketed as fire resistant does not establish compatibility with the damper's required arrangement.
Obtain missing details through the matching-assembly documentation request. Identify the duct service as well: a permitted ventilation penetration detail must not be copied into an unclassified grease exhaust application.
Assign inspection and evidence collection before adjacent work hides the relevant interfaces. The record should identify the actual components, detail revision and responsible acceptance, not only show a finished ceiling.
Retain the accepted arrangement for later service or replacement. If the wall, floor, device or sleeve changes, review the affected installation again. The useful outcome is a supported complete penetration, rather than a rated component fitted into a different construction by appearance.